we offer service contracts for all our services
we offer service contracts for all our services
S T Controls supplied, installed and programmed the Control Systems for the Grand Cascade. In total, 127 computer controlled jets fire in sequence during four separate routines, each lasting around 30 minutes.
The Alnwick Garden was opened to the general public officially in October 2002 by its patron HRH The Prince of Wales. Experts predicted that 67,000 people would visit The Garden in its first year but The Garden has a way of provoking interest and intrigue and the actual number of people who visited was 318,000! With over half a million visitors last year The Garden has proved to be real favourite, making The Alnwick Garden the third most visited, paid for, garden in the UK.
S T Controls supplied installed and programmed the pressurised booster set for the irrigation equipment.
Lord's is the setting for some of the best cricket in the world. It hosts Test matches, one-day internationals and domestic one-day finals, plus most of Middlesex's home games, some historic fixtures (such as Oxford vs Cambridge), and a number of village and club cricket finals.
ST Controls designed, manufactured and installed the control system and feature for the children's wet play area at Rockcliffe Hall
S T Controls supplied and installed the equipment and lighting to create the effect of a bubbling volcano crater inside the moss house located in the garden of secrets
S T Controls supplied and installed the equipment and lighting to create the spectacular eruption explosion special effects on the volcano and mini volcano with the use of mist and light
Used out in the field cleaners often get damaged
ST controls stripped, rewired and rebuilt everything to do with control and electricals on this machine
An interesting feature for a child's play area and a challenge for us.
we were able to simulate a manual pumping action without an
actual pump or power supply, the difficulty was in stopping the flow of water after a short time delay time no matter what position the handle was left in to prevent vandalism and wastage
Two fountains in front of the parks cafe have been restored to working order
S T Controls supplied and installed the electrical side of the pressurised irrigation system consisting of 9 pumps capable of running 1 to 12 hose reel rain guns over a great distance and up hill
S T Controls Installed the plantrooms and water features at One Tower Bridge in London right alongside the River Thames
Project to design, manufacture and install a fully automatic wash down system to clean the parlour after each batch of cows has been milked, once the gates raise to allow the cows to leave a system of 80 nozzles, 40 per side, jet the floor clean